© 2015 by MB BIM Solutions

5995 Greenwood Plaza Blvd, Suite 120
Greenwood Village, CO 80111

FOLLOW US:

  • LinkedIn App Icon
  • Twitter App Icon

Of Core Walls and Offices

MB BIM Solutions was honored to be a part of G.H. Phipps' Concrete Services team for the One Belleview Station project! The 15 story office building offers 320,000 SF of office space and 4 levels of parking. MB BIM Solutions provided the lift drawings for the CIP core walls and coordinated all of the embeds into the walls. There were more than 3,600 embedded plates and inserts for the precast framing, steel stairs, formwork, ductwork, and steel framing. Coordination with the formwork system avoided conflicts with the other embeds, allowing for a 5 day turn around time between pours.

Learn more about the project.

#OneBelleviewStation

Projects and Press
No tags yet.
Archive
  • March 2016 (5)
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • HOME

  • ABOUT US

  • SERVICES

  • OBJECTIVES

  • PORTFOLIO

  • CAREERS

  • CONTACT

  • More