Children's Hospital East Addition

MB BIM aided in the integrated delivery of a 350,000 sq ft addition to the east tower at the Fitzsimons campus of Children's Hospital. The addition utilizes a structural steel frame gravity system and a concrete elevator and stair core lateral system.