MEPF COORDINATION LEAD

MEPF COORDINATION LEAD

Compress schedule and reduce cost using Navisworks Clash Detection to identify clashes between design models and models provided by various trade subcontractors and determine solutions, virtually, prior to installation in the field.  Use clash metrics to hold subcontractors accountable, track, forecast and manage the coordination process.

2.jpg
Arrow_3_edited.png
VIRTUAL MOCK-UPS
3.jpg

VIRTUAL MOCK-UPS

Mitigate risk and reduce cost by creating a highly detailed model and drawings for a specific building element or area, including building envelopes. The model accounts for sequence and interaction between multiple trades.

Arrow_3_edited.png
RCP COORDINATION DRAWINGS

RCP COORDINATION DRAWINGS

Provide schedule and cost savings by using reflected ceiling plans to locate and coordinate the visible ceiling elements for the MEFP and other trade contractors.

1.png
Arrow_3_edited.png
CMU COORDINATION DRAWINGS
3.png

CMU COORDINATION DRAWINGS

Use CMU elevation views reduce cost and save time by to locating and coordinating the openings and grouted cells needed by various trades prior to installation.

Arrow_3_edited.png